Goal: Through the Heron Lake Phosphorus Reduction Project 2 low interest loan project, the HLWD proposes to replace 30 Subsurface Sewage Treatment Systems (SSTS) over the three-year period.
- Funded through a Clean Water Partnership loan program administered by MPCA
- Timeframe: June 2016 to May 2019
- Loan funds: $450,000.00
- Inkind match (HLWD): $5,234.00
- Total project cost: $455,234.00
