Goal: To reduce nonpoint source pollution loads through 30 septic system replacements.
• Funded through a CWP loan program administered by the MPCA
• Timeframe: July 2020 to June 2023
• Loan funds: $450,000.00
• Inkind match (HLWD): $9,650.00
• Total project cost: $459,650.00
